Burlingame Point Project

Main Info
Summary: 

An application has been submitted for development of a new office/life science campus consisting of four office buildings and an amenities building with a total of 767,000 square feet of floor area on an 18.13 acre site located at 300 Airport Boulevard. Two 5-story buildings, one 7-story building, one 8-story building and a 2-story amenities building are proposed. The amenities building would include a child care facility, an exercise facility and a cafe/break room. Parking would be provided in a five-story parking structure, in a podium level parking area below the four office buildings, and in smaller parking lots scattered throughout the site. The Draft EIR for the project is now complete and is being distributed for a 45-day public review period. The Draft EIR identifies and addresses the possible environmental impacts of the project, and recommends mitigation measures to reduce these impacts.

Details

Resource Types:

Sustainability Topics:

Geographic Scope / Jurisdiction :